Kerry Foods Ossett Refrigeration
Value – €1,948,640.00
Status – Completed
Erneside Engineering were awarded the contract of installing the refrigeration services for an extension to Kerry Food’s processing facility in Ossett, U.K.
Erneside installed a new refrigeration plantroom skid which was designed in-house by us, shipped to the U.K and assembled entirely on site.
This included:
- Evaporators
- Condensers
- Pipework & ancillary equipment
- Plate Heat Exchangers
- Pumps
- Water/Refrigeration Storage Tanks
Erneside have completed numerous mechanical projects for Kerry Foods in the U.K, including Hartlepool and Enniskillen. These included the installation of air, gas, water services and steam services.
Erneside have continued to secure repeat business from Kerry Foods as a result of the high quality, value engineered solutions we provide. The value of projects completed in the U.K for Kerry Foods by Erneside is in excess of €2.8 million.