ABP – Cahir

Value – €2,866,078.00

Status – Completed

Erneside Engineering were awarded the design & build contract to refurbish the ABP facility in Cahir, Co. Tipperary.

The project involved:

  • The installation of a new boiler house containing 2no. 2500kW hot water boiler
  • A bespoke wash skid/low loss header
  • Refurbishment of the existing steam generation plant room
  • Installation of 45deg, 65deg, & 90deg ring main pipework systems for the hot water generation skid out in the CPM & abattoir areas
  • Installation of natural gas, oil cold water, & compressor pipework
  • Comprehensive heat recovery ventilation systems throughout the facility
  • Supply & installation of plant, compressors, & water treatment system

In addition, Erneside also fabricated & supplied bespoke stainless steel products such as 1-man to 10-man s/s automatic sinks, apron washers, production waste disposal units.

 

  

 